Overview
Large scale site clearing, heavy earthworks, stamped concrete walkways, box culverts and road paving for heavy commercial traffic.
A dual carriageway access project engineered for heavy commercial vehicle traffic and local rainy weather, completed three weeks ahead of the contracted timeline.
Project highlights
- Engineered sub base compaction resisting rainy season erosion.
- Dual reinforced box culverts for flood prevention.
- Completed three weeks ahead of schedule.
Project details
ClientCommercial Property Consortium
ScopeSub grade and surface paving
Length2.4 km dual carriageway
Concrete3,800 cu.m
Steel190 metric tons
ComplianceFederal Highway Spec
Duration6 months